Image of back arrow Back to filtered results

XRN 5771
Amendments to Demand Side Response (DSR) Arrangements (Modification 0866)

Last Updated
29 Apr 2024
Status
Current
Release Type
Ad-hoc
Implementation Date
TBC
Proposer Xoserve Impacted DSC service area

TBC

To be confirmed

Customer Change Team Leader uklink@xoserve.com

Summary

Modification 0866 has been raised to introduce further enhancements to Gas DSR arrangements for daily metered consumers following experience of recent reforms and based on consumer feedback.

The Modification proposes that DSR arrangements for daily metered Consumers will be reformed in the following areas:

  • The timings and content of the DSR Options procurement tender process.
  • How the process of exercise of a DSR Option works, including how the ‘starting point’ for demand reduction is determined.
  • Enable Class 2 Consumers to contract directly with NGT for DSR Options; and
  • Amend the credit rules for Consumer DSR.

This proposal has the potential to increase the level of participation in the gas DSR Options process. This in turn will further enhance the suite of pre-emergency tools NGT can call upon in the event of a forecast supply shortage. 

Impacted Customer Types

  • Shipper
  • DNO
  • IGT
  • NGT

Documents

Document title Comment Last updated CHMC outcome
Change Proposal CP Raised 11/04/2024 ChMC Approved on 10/04/2024
Initial Review Stage not required   N/A
High Level Solution Options Stage not yet reached   N/A
Solution Review Stage not yet reached   N/A
Detailed Design 3281.3 - LO - PO 20/06/2024 Approved at ChMC 12/6/24
DSG Discussion 22.04.24 29/04/2024 N/A
Evaluation Quotation Reports (EQR) Stage not yet reached   N/A
Business Evaluation Reports (BER) Stage not yet reached   N/A
Change Completion Reports (CCR) Stage not yet reached   N/A

Timeline

Change Proposal raised
27/03/24
Status Awaiting ChMC Approval
Change development
10/04/24
Status ChMC Approved into Development
Solution development
27/03/24
Detailed design
Detailed Design Change Pack Issued 13/05/23
Status Consultation closes out on 28/05/24
Awaiting delivery
12/06/24
Status Detailed Design Approved at ChMC
In delivery
Change implemented

Contact the Change Team

Need to get in touch with a member of the Change Team?

You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.