Image of back arrow Back to filtered results

XRN 6001
Modification 0909 - Refining the Class 2 Individual Valid Meter Reading Requirement Performance Measures

Last Updated
01 Dec 2025
Status
Current
Release Type
Unallocated
Implementation Date
TBC
Proposer SEFE Energy Impacted DSC service area

Service Area 3 (Current Apr 21)

Manage updates to customer portfolio

Customer Change Team Leader uklink@xoserve.com

Summary

This Change Proposal has been raised to deliver the requirements set out within Modification 0909. At high-level, this change seeks to:

  • Update the ‘Individual Valid Meter Reading Requirement’ (as per UNC 5.17.1(c)) to create two conditions which will form the Individual Valid Meter Reading Requirement for Class 2 (see CP for full details)

As well as updating the conditions for the Class 2 Individual Valid Meter Reading Requirement, this Change Proposal also seeks to create consistency by ensuring both the D+1 and D+5 positions are reported on in the general Class 2 Read Performance (PARR reports 2A.5 and 2B.5).

Impacted Customer Types

  • Shipper
  • DNO

Documents

Document title Comment Last updated CHMC outcome
Change Proposal Change Proposal Raised 01/12/2025 For approval at ChMC in December
Initial Review Stage not yet reached   N/A
High Level Solution Options Stage not yet reached   N/A
Solution Review Stage not yet reached   N/A
Detailed Design Stage not yet reached   N/A
Evaluation Quotation Reports (EQR) Stage not yet reached   N/A
Business Evaluation Reports (BER) Stage not yet reached   N/A
Change Completion Reports (CCR) Stage not yet reached   N/A

Timeline

Change Proposal raised
01/12/25
Status CP to be presented at ChMC for approval on 10/12/2025
Change development
Solution development
Detailed design
Awaiting delivery
In delivery
Change implemented

Contact the Change Team

Need to get in touch with a member of the Change Team?

You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.