XRN 5172
Urgent Mod - Ability to Reflect the Correct Customer Network Use and System Offtake Quantity (SOQ) During COVID-19
Last Updated
|
24 Sep 2020 |
Status
|
Withdrawn
|
Release Type
|
Unallocated |
Implementation Date
|
TBC
|
Proposer | Gazprom | Impacted DSC service area |
|
Customer Change Team Leader | uklink@xoserve.com |
Summary
Since the COVID-19 pandemic many sites are in lockdown and business as usual has been disrupted. This has resulted in large changes in network use, especially for Class 1 and Class 2 Supply Meter Point sites, with many either ceasing production or seeing substantial reductions in daily demand. As a result, the site’s Transportation charges are no longer reflective of their actual use.
This Modification proposes to create a defined period (implementation date to 30 September 2020) in which Class 1 and Class 2 Supply Meter Points (excluding Seasonal Large Supply Meter Points) can submit revisions to SOQ values to the CDSP to better reflect their gas network use during this summer. For the avoidance of doubt the process would not be retrospective.
Impacted Customer Types
- IGT
- Shipper
- DNO
Documents
Document title | Last updated | Type |
---|---|---|
XRN5172 - CP | 24/Sep/2020 |
Timeline
Contact the Change Team
Need to get in touch with a member of the Change Team?
You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.