Last Updated
|
15 Nov 2021 |
Status
|
Implemented
|
Release Type
|
Major |
Implementation Date
|
05
Nov
2021
|
Proposer | Northern Gas Networks | Impacted DSC service area |
Service Area 16 Provision of Supply Point Information Services and Other Services Required to be Provided Under Condition of the GT Licence |
Customer Change Team Leader | uklink@xoserve.com |
Summary
The allowable values for the ‘DCC Service Flag’ data item in the DXI File Format, E46 record, need to be updated to be in line with those proposed by SEC MP077 ‘DCC Service Flagging’. The new DCC Service Flag states should align to what is written in the SEC and allow Users to tell the difference between Devices on a Smart Metering System (SMS) that are Active, installed but not commissioned or decommissioned.
The SEC proposal is seeking to remove the allowable values of “S” - Suspended and “W” – Withdrawn and replace them with values of “N” – Non-Active and “I” – InstalledNotCommissioned.
This Change is in scope of November 2021 Major Release.
Impacted Customer Types
- DCC
Documents
Document title | Last updated | Type |
---|---|---|
XRN5142 - CP | 05/Aug/2021 | |
XRN5142 - High Level Solution Options | 14/Aug/2020 |
Timeline
Contact the Change Team
Need to get in touch with a member of the Change Team?
You can email us at: uklink@xoserve.com and we'll get back on the same day between the hours of 9:00am to 4:30pm.